How to build a world-class construction scheduling team

Outbuild CEO Franco Giaquinto joins Beyond Deadlines to walk through how to build a scheduling organization from the ground up—standards, structure, trade collaboration, and keeping the schedule aligned with what's happening in the field.

Prepare to explore:

  • Designing a scheduling group from scratch — how to move from no standards and project-to-project chaos to a deliberate, data-driven, people-centered planning organization.
  • The million-dollar PDF problem — why monthly high-level updates leave owners blind, and how daily field input enables real mitigation before delays compound.
  • Collaboration across the project lifecycle — building the baseline with CPM plus lean methods like last planner system, and running make-ready work so trades can truly commit.
  • Keeping collaboration from becoming chaos — strategic schedule as the umbrella, tactical look-ahead underneath, and gatekeepers who approve every change.
  • Accountability and traceability — connecting submittals and RFIs to the schedule, knowing exactly who and what caused a delay, and turning structured data into lessons that carry to the next project.
  • ‍

    testimonials

    What our customers are saying.

    Scheduling directors, superintendents, and operations leaders at large GCs share how Outbuild keeps every project on the same plan.

    get started

    Ready to see Outbuild?

    Join hundreds of contractors from 10+ countries that are saving money by scheduling better

    Please enter a business email.
    *Required
    Thanks for reaching out.
    We’ll be in touch soon!
    Something went wrong while submitting the form—please try again.