How to build a world-class construction scheduling team

Outbuild CEO Franco Giaquinto joins Beyond Deadlines to walk through how to build a scheduling organization from the ground up—standards, structure, trade collaboration, and keeping the schedule aligned with what's happening in the field.

Prepare to explore:

  • Designing a scheduling group from scratch — how to move from no standards and project-to-project chaos to a deliberate, data-driven, people-centered planning organization.
  • The million-dollar PDF problem — why monthly high-level updates leave owners blind, and how daily field input enables real mitigation before delays compound.
  • Collaboration across the project lifecycle — building the baseline with CPM plus lean methods like last planner system, and running make-ready work so trades can truly commit.
  • Keeping collaboration from becoming chaos — strategic schedule as the umbrella, tactical look-ahead underneath, and gatekeepers who approve every change.
  • Accountability and traceability — connecting submittals and RFIs to the schedule, knowing exactly who and what caused a delay, and turning structured data into lessons that carry to the next project.
  • testimonials

    What our customers are saying.

    From billion-dollar companies to smaller family-owned businesses. They all believe that construction deserves a better scheduling and planning tool.

    get started

    Ready to see Outbuild?

    Join hundreds of contractors from 10+ countries that are saving money by scheduling better

    Please enter a business email.
    *Required
    Thanks for reaching out.
    We’ll be in touch soon!
    Something went wrong while submitting the form—please try again.