Michael Wong and Collin Creach at Constructive Podcast

A candid conversation on why construction scheduling fails the field—and how connecting the master schedule to real-time lookaheads empowers the people building, surfaces roadblocks early, and prevents costly claims.

Prepare to explore:

  • Why scheduling is construction's biggest unsolved problem — how Outbuild connects the master schedule to the field's look-ahead into one source of truth, instead of two disconnected tools.
  • Empowering the people who actually build — why superintendents should plan and lead, not burn hours in Excel, and how giving the field a voice creates real buy-in.
  • Catching roadblocks before they become claims — tracking constraints visually with 20–30 sets of eyes on site, and using PPC to measure what's really getting done.
  • Culture beats tools every time — why the right team can run a schedule on "string and paper," and why most schedules become reporting tools no one actually uses.
  • Beyond P6 and Excel — marrying scheduling and planning in one place, and the risk of building AI on fudged schedule data.
  • ‍

    testimonials

    What our customers are saying.

    Scheduling directors, superintendents, and operations leaders at large GCs share how Outbuild keeps every project on the same plan.

    get started

    Ready to see Outbuild?

    Join hundreds of contractors from 10+ countries that are saving money by scheduling better

    Please enter a business email.
    *Required
    Thanks for reaching out.
    We’ll be in touch soon!
    Something went wrong while submitting the form—please try again.